Administrative Services

309 TASK FORCE

309 Task Force

Overview:

The Task Force for Building Renewal is a division of AS with oversight provided by the Committee on Building Maintenance. The Task Force is responsible for Deferred Repair, Fire/Life-Safety, ADA (American's with Disabilities Act), and Energy Conservation projects for state buildings.

Deferred Repair - Includes all elements of the building envelope, including roofs, walls, doors, and windows. It also includes the building infra-structure including heating, ventilating and air conditioning systems, electrical systems and plumbing.

Fire/Life-Safety - Includes projects which correct deficiencies which would impair the life or health of any individual within the facility or the facility itself.

Americans with Disabilities Act (ADA) - Accessibility Guidelines were established with the passage of this act and are the basis for all Task Force corrective action.
Energy Conservation
- Includes any measures taken to conserve energy use by the building.

 

INTERIM-ADMINISTRATOR

Ron Rehtus

402-471-3515 | Email

AS Task Force for Building Renewal

1526 K Street Suite 210
Lincoln, NE 58508-2732
phone: 402-471-3515
fax: 402-471-3262



Mission Statement:
To address the state’s sizable need for deferred building repairs and improvements to the extent possible with available funding, utilizing those funds wisely and efficiently.

Announcements:

Take a look at the
new training calendar!

Administrative Services| 1526 K Street, Lincoln, NE 68508 | 402-471-6500

Privacy Statement | Security Information | Acceptable/Intended Use Policy | Accessibility Policy

Contact Webmaster